Skip to main content

Freight intelligence · live

The decision layer for disrupted freight.

PO-level reroutes, carrier alternatives, and booking windows, delivered into your TMS days before disruption hits.

Built for freight teams managing the world’s most disrupted corridors.

Corridor study / 00118.03.2026
Orthographic map of Europe, Africa and western Asia, with illustrative Hamburg–Jeddah routes through Suez and around the Cape.
02Via the Cape
+26 days in transit
PO-4471 Hamburg Jeddah
Cape reroute · 40 daysIllustrative routes
01 / The decisionIntelligence, made operational

PO-4471 · Hamburg → Jeddah

Reroute now:
secure Cape capacity

Suez suspended. A longer route.
A decision made before the window closes.

Suez transit compared with Cape reroute Original Suez transit: 14 days. Cape reroute: 40 days. An additional 26 days in transit. The graphic compares duration, not geographic distance. Suez · suspended14 dCape · confirmed40 d 010203040 days
Transit duration · 18 March 2026 brief
PO-4471 · Hamburg → Jeddah Brief · Mar 18
Reroute now: secure Cape capacity Hapag-Lloyd Al Jasrah · Suez suspended
Original plan
Suez transit via Port Said
14 days
Suspended

ETA Apr 02. Regional cover withdrawn; carriers moved off Suez.

Ekho recommends
Cape reroute via Good Hope
40 days
Confirmed

+26 d. ETA Apr 28. Surcharge $150–500/TEU. Lock capacity 2–3 wks out; no uncongested route.

Confidence 0.82 EIA · Lloyd’s · AIS · sanctions
1M+ live sources Carrier filings Port telemetry AIS movement Weather models Sanctions feeds
02 / In the fieldThe Hormuz dossier

Signal → decision

Your TMS shows the news.
Ekho shows the reroute.

With Suez transit suspended and insurers withdrawing regional cover, carriers shifted Europe–Middle East sailings around the Cape. The brief below quantified the delay and prescribed how to secure scarce capacity.

The Strait of Hormuz photographed from the International Space Station in 2021
Regional context · 24 March 2021
Image: NASA / ISS
Hormuz Brief, Day 18 18 March 2026
4–16 wk Ceasefire window (forecast)
+26 d Cape transit penalty
$150–500 Surcharge per TEU
0.82 Model confidence

EIA · Lloyd’s List · carrier filings · AIS · sanctions feeds

Prescribed action

Hold Cape contracts. Secure container allocation 2–3 weeks before loading. No uncongested route exists; do not cancel on ceasefire news.

25 days later, seven forecasts confirmed. The ceasefire arrived April 8, inside the 4–16 week call; Cape routing settled at 35–45 days. See the verification →
03 / PerspectiveFrom the operating side
Ekho built a platform that does what I have always needed as a supply chain executive. It connects dots across weather, social sentiment, congressional voting, union communications, and everything that actually predicts disruption.
Renée Ure
Former COO, Lenovo ISG · Advisor, Ekho Labs
Featured in
04 / The methodologyFrom signal to consequence

Methodology

The data behind your next freight decision.

Ekho combines 1M+ public and licensed data sources (sanctions registries, AIS, port authority feeds, carrier EDI, weather models, social signal networks, and congressional/union communications) into a comprehensive risk model for freight teams.

Data sources1M+
Update cadencereal-time
Median lead time12 days
Source → model → action
Source feeds
  • AIS vessel signals
  • Port authority feeds
  • Carrier EDI
  • Weather models
  • Sanctions registries
Shipment impact
Example / PO-4471Suez suspended
14 40 transit days

+26 days via Cape

Your TMS
  • PO-level reroutes
  • Carrier alternatives
  • Booking windows
18 March: Suez suspended for PO-4471, Hamburg → Jeddah.
05 / The economicsOne disruption. Multiple consequences.

Economics

The cost of acting late.

A single disruption triggers costs across multiple lines. They compound fast:

Detention & demurrageper container, per day
Equipment premiumssurcharges on scarce capacity
Rebooking & reallocationnew carrier, new window, new rate
Downstream delayswarehouse, last-mile, production
Customer impactSLA penalties, service recovery

On PO-4471, equipment surcharge alone ran $150–500/TEU. Ekho helps teams make the call earlier, before these costs stack.

Cost anatomy
Five layers of disruption costs, shown symbolically rather than to scale 05 04 03 02 01
06 / ConnectedInside your existing workflow

Integration

Delivered into the systems your teams already use.

Connect Ekho to your existing TMS, ERP, and visibility tools through a read-only API. We scope the integration to your stack during onboarding.

  • SaaS. SSO/SAML. Role-based access.
  • Read-only API.
  • Live in under 24 hours.
Explore your stack
Ekho LabsRead-only API
Integration scope tailored to your stack during onboarding.
Field notes / 2026
18 March → 12 April · Published case study

From forecast to fact.

The forecast · 18 March
4–16weeks

We said: Ceasefire in 4–16 weeks

The outcome · Verified
5.5weeks

Came at week 5.5 (April 8).

Read all seven forecasts and the verification
07 / Stay aheadEkho Labs

Get started

Your next disruption is already forming.

See Ekho run on your lanes. Book a 20-minute walkthrough, or read the latest brief first.

Or get the next intelligence brief every other Tuesday.